PROJECT
4th floor Flat refurbishment
LOCATION
Temple, London
INDUSTRY
Residential
A recent project that was completed after “stepping back in time” we brought it back into 2020s – working directly with the client in the Middle Temple Estate in Central London.
The flat was fully refurbished including plastering, decorations, new kitchen, new bathroom and WC , re-wiring and electrical alterations and new boiler was installed along with overhauling the historic box sashes to ensure 100% usability.
Working within a busy barristers chambers with very strict reduced working hours where no noise can be made, also on the 4th floor with no lift.
FOLLOW US ON SOCIAL MEDIA
Leave us a message!