PROJECT

Carry out works on a Private Grade I listed School

LOCATION

Kent

INDUSTRY

Education 

PRIVATE SCHOOL KENT

A recent project completed over 3 classrooms in a historic Grade I stable-block now working as a nursery. Included forming openings and installation of screens to match those originally installed, full decoration and making good, M&E rationalisations, engineered flooring, heating adaptations and ceiling installations and boxing out all exposed pipe works.

ISSUES & OBSERVATIONS

The excavation works needed to be carried out carefully as there are vaults below the slab and the thickness of the existing build up was not certain. We carried out a constant watching brief from the vaults below to avoid any issues. The tree roots also needed to be removed very carefully as they were situated close to the perimeter wall, investigation works were carried out prior to removal to establish the direction of the roots to ensure they were not breaching the wall’s foundation.

Latest News

Welcoming our Work Experience student

We are welcoming a work experience candidate to our company next week.  We believe this experience will be mutually beneficial, providing them with invaluable insights and giving us the chance to share our knowledge and expertise.

FOLLOW US ON SOCIAL MEDIA

Leave us a message!